A platform for research: civil engineering, architecture and urbanism
Mauvoisin hydroelectric project
Construction of 237 m high and 520 m long arch dam forming reservoir of 180 million cu m capacity for 127, 500 kw power plant at Fionnay; 2.03 million cu m of concrete used; large scale blasting techniques used; in one single round 100,000 cu m of rock was blasted; rock stabilization by injection of concrete; cooling of concrete by one in. diam cooling tubes.
Mauvoisin hydroelectric project
Construction of 237 m high and 520 m long arch dam forming reservoir of 180 million cu m capacity for 127, 500 kw power plant at Fionnay; 2.03 million cu m of concrete used; large scale blasting techniques used; in one single round 100,000 cu m of rock was blasted; rock stabilization by injection of concrete; cooling of concrete by one in. diam cooling tubes.
Mauvoisin hydroelectric project
L'amenagement hydroelectrique de la chute de Mauvoisin
Rambert, O. (author) / Gavard, M. (author)
Genie Civil ; 135
1958
13 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1963
Projet de vidange du barrage de Mauvoisin
British Library Online Contents | 2001
|Barrages du mauvoisin et de la grande dixence
TIBKAT | 1954
|Long-time measurements in Mauvoisin arch-dam, highest arch dam in world
Engineering Index Backfile | 1967
|Petenwell hydroelectric project
Engineering Index Backfile | 1951
|