A platform for research: civil engineering, architecture and urbanism
Kurobe Dam to Be 630 Ft domed arch
Domed arch concrete dam, under construction by Kansai Power Co, Osaka, will be 1240 ft long at crest and will contain 2.1 million cu yd of concrete; it is founded on coarse grained biotite granite; central overflow spillway is designed to pass flood flow of 35,000 cfs; water impounded is to be conveyed through 6-mi pressure tunnel to underground powerhouse equipped with three 86,000 kw generators.
Kurobe Dam to Be 630 Ft domed arch
Domed arch concrete dam, under construction by Kansai Power Co, Osaka, will be 1240 ft long at crest and will contain 2.1 million cu yd of concrete; it is founded on coarse grained biotite granite; central overflow spillway is designed to pass flood flow of 35,000 cfs; water impounded is to be conveyed through 6-mi pressure tunnel to underground powerhouse equipped with three 86,000 kw generators.
Kurobe Dam to Be 630 Ft domed arch
Eng News-Rec
Engineering News-Record ; 160
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Mexico builds first domed arch
Engineering Index Backfile | 1963
Kurobe River no. 4 H.E. scheme
Engineering Index Backfile | 1961
|Kurobe-shi Kokusei Bunnka Center/Colare
British Library Online Contents | 1996
|Characteristics of staged construction in Kurobe dam
British Library Conference Proceedings | 1994
|Environmental study on sediment flushing in the Kurobe river
British Library Conference Proceedings | 2006
|