A platform for research: civil engineering, architecture and urbanism
Long-boomed cranes erect heavy steel for highway bridge
Highway bridge east of Belle Vernon, Pa is 1327 ft long; main cantilever span is continuous 720 ft; 52-ft I beam span is at west end and 100-ft plate girder span is at east end; two rigs carrying 155 and 150 ft of boom and jib, respectively, placed 5 million lb of steel.
Long-boomed cranes erect heavy steel for highway bridge
Highway bridge east of Belle Vernon, Pa is 1327 ft long; main cantilever span is continuous 720 ft; 52-ft I beam span is at west end and 100-ft plate girder span is at east end; two rigs carrying 155 and 150 ft of boom and jib, respectively, placed 5 million lb of steel.
Long-boomed cranes erect heavy steel for highway bridge
Excavating Engr
Excavating Engineer ; 52
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Long-boomed backhoe digs deep trench
Engineering Index Backfile | 1950
Hammerhead derricks erect steel towers of bay bridge
Engineering Index Backfile | 1935
|Bridge travelers erect aircraft building
Engineering Index Backfile | 1942
Jacks on barge erect arch bridge
Engineering Index Backfile | 1958
|