Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Long-boomed cranes erect heavy steel for highway bridge
Highway bridge east of Belle Vernon, Pa is 1327 ft long; main cantilever span is continuous 720 ft; 52-ft I beam span is at west end and 100-ft plate girder span is at east end; two rigs carrying 155 and 150 ft of boom and jib, respectively, placed 5 million lb of steel.
Long-boomed cranes erect heavy steel for highway bridge
Highway bridge east of Belle Vernon, Pa is 1327 ft long; main cantilever span is continuous 720 ft; 52-ft I beam span is at west end and 100-ft plate girder span is at east end; two rigs carrying 155 and 150 ft of boom and jib, respectively, placed 5 million lb of steel.
Long-boomed cranes erect heavy steel for highway bridge
Excavating Engr
Excavating Engineer ; 52
1958
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1957
Hammerhead derricks erect steel towers of bay bridge
Engineering Index Backfile | 1935
|Bridge travelers erect aircraft building
Engineering Index Backfile | 1942
Jacks on barge erect arch bridge
Engineering Index Backfile | 1958
|TOWER CRANES - Easier and quicker to erect are prerequisites for today's tower crane users.
Online Contents | 1998