A platform for research: civil engineering, architecture and urbanism
Pipe templates solve tough bridge-rebuilding job
Santa Fe bridged gap with three 60-ft deck girder spans and 22-ft beam span, when derailment caused collapse of truss span across Washita river; recommendation was to construct three new piers of 14 in. 117-lb steel H-piles inserted and grouted in holes drilled 6 ft into rock; to cope with fast water and rock bottom, method was to fabricate templates of 30 in. pipes, sink them to rock, drill holes into rock through pipes, and insert H-piles.
Pipe templates solve tough bridge-rebuilding job
Santa Fe bridged gap with three 60-ft deck girder spans and 22-ft beam span, when derailment caused collapse of truss span across Washita river; recommendation was to construct three new piers of 14 in. 117-lb steel H-piles inserted and grouted in holes drilled 6 ft into rock; to cope with fast water and rock bottom, method was to fabricate templates of 30 in. pipes, sink them to rock, drill holes into rock through pipes, and insert H-piles.
Pipe templates solve tough bridge-rebuilding job
Ry Track Structures
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
IuD Bahn | 2011
|Engineering Index Backfile | 1942
|Rebuilding CSXT's Ninemile Bridge
Online Contents | 1997