A platform for research: civil engineering, architecture and urbanism
Tied-cantilever bridge -- Pioneer structure in U S
Benton City-Kiona Bridge near Richland, Wash is 400 ft long with 170-ft main span and has deck depth of only 3 ft 3 in. to provide maximum waterway with minimum approach grades; framing is suspended span supported on cantilevered ends of adjoining spans; how problem of adequately anchoring diagonals into concrete of deck was solved.
Tied-cantilever bridge -- Pioneer structure in U S
Benton City-Kiona Bridge near Richland, Wash is 400 ft long with 170-ft main span and has deck depth of only 3 ft 3 in. to provide maximum waterway with minimum approach grades; framing is suspended span supported on cantilevered ends of adjoining spans; how problem of adequately anchoring diagonals into concrete of deck was solved.
Tied-cantilever bridge -- Pioneer structure in U S
Civ Eng (NY)
Hadley, H.M. (author)
1958
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Cantilever methods erect three-span continuous truss bridge with tied-arch middle span
Engineering Index Backfile | 1943
Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|Cantilever structure for bridge and construction method of cantilever structure for bridge
European Patent Office | 2022
|