A platform for research: civil engineering, architecture and urbanism
Autoroute bridge presents pier problems
Structure of two bridges and one viaduct of Quebec autoroute is 301 ft long and comprises 42 piers; piers constructed within cofferdam, by removing earth and pouring concrete on to bedrock; for 19 piers in swamp and quicksand area, Franki piles were driven; 50,000 tons of gravel laid over swamp to provide surface for equipment.
Autoroute bridge presents pier problems
Structure of two bridges and one viaduct of Quebec autoroute is 301 ft long and comprises 42 piers; piers constructed within cofferdam, by removing earth and pouring concrete on to bedrock; for 19 piers in swamp and quicksand area, Franki piles were driven; 50,000 tons of gravel laid over swamp to provide surface for equipment.
Autoroute bridge presents pier problems
Eng Contract Rec
1958
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Autoroute A-25 Project - Main Bridge Innovations
British Library Conference Proceedings | 2010
|suisse - autoroute transjurane
Online Contents | 1999
Online Contents | 2010
|Long, single-span arch bridge solves problem for autoroute
Engineering Index Backfile | 1964
|Engineering Index Backfile | 1957