A platform for research: civil engineering, architecture and urbanism
Erection of biggest precast arches
Six arches placed in position for hexagonal building under construction in San Francisco; each weighs 56 ton, is 18 in. thick, 80 ft long (horizontal projection) and varies in depth from 2 ft 9 in. to 8 ft 6 in.; erection procedure.
Erection of biggest precast arches
Six arches placed in position for hexagonal building under construction in San Francisco; each weighs 56 ton, is 18 in. thick, 80 ft long (horizontal projection) and varies in depth from 2 ft 9 in. to 8 ft 6 in.; erection procedure.
Erection of biggest precast arches
Western Construction
Western Construction ; 33
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1947
|Engineering Index Backfile | 1969
|Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1957
Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|