A platform for research: civil engineering, architecture and urbanism
Goliath crane for Swedish shipyard -- For sections up to 800 tonnes
Particulars of crane built by Krupp-Ardelt, which forms part of equipment of new drydock for construction of vessels of up to 700, 000 tons at Kockums Mekaniska Verkstads AB; essentially, it comprises bridge girder rigidly attached at one end to pier leg, while other end rests on shear legs by means of spherical joint, providing kinematic support of structure; maximum height under hook is 197 ft, height to top of bridge girder 216 ft 2 in. and to top of auxiliary crane 252 ft 7 in.; length of bridge girder is 297 ft 10 in.; crane moves on 2200-ft long rail track, has 24 wheels on each side, etc. (06505)
Goliath crane for Swedish shipyard -- For sections up to 800 tonnes
Particulars of crane built by Krupp-Ardelt, which forms part of equipment of new drydock for construction of vessels of up to 700, 000 tons at Kockums Mekaniska Verkstads AB; essentially, it comprises bridge girder rigidly attached at one end to pier leg, while other end rests on shear legs by means of spherical joint, providing kinematic support of structure; maximum height under hook is 197 ft, height to top of bridge girder 216 ft 2 in. and to top of auxiliary crane 252 ft 7 in.; length of bridge girder is 297 ft 10 in.; crane moves on 2200-ft long rail track, has 24 wheels on each side, etc. (06505)
Goliath crane for Swedish shipyard -- For sections up to 800 tonnes
Engineer
Engineer ; 225
1968
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Operation David -- Demolition of Goliath crane
Engineering Index Backfile | 1966
|Europe - Swedish mercury clean-up: 40 tonnes remain
Online Contents | 1999
IET Digital Library Archive | 2004
Online Contents | 2009