A platform for research: civil engineering, architecture and urbanism
Doubled asphalt layer improves Fort Dodge streets
Fort Dodge, Iowa, resurfaced its streets with asphaltic-concrete coat and finished them with asphalt seal coat thus compensating for war-deferred maintenance; description of procedure; data on asphaltic concrete, asphalt, sieve analysis and costs.
Doubled asphalt layer improves Fort Dodge streets
Fort Dodge, Iowa, resurfaced its streets with asphaltic-concrete coat and finished them with asphalt seal coat thus compensating for war-deferred maintenance; description of procedure; data on asphaltic concrete, asphalt, sieve analysis and costs.
Doubled asphalt layer improves Fort Dodge streets
Am City
Pilcher, C.B. (author)
American City ; 61
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Comprehensive Plan - Fort Dodge, Iowa
NTIS | 1970
The Chicago Great Western and the Fort Dodge Bridge
Engineering Index Backfile | 1903
Engineering Index Backfile | 1925
|Veteran Iowa builder located gravel plant near Fort Dodge
Engineering Index Backfile | 1941
Improvements of routes 20 and 169 Thru Fort Dodge, Iowa
Engineering Index Backfile | 1936
|