A platform for research: civil engineering, architecture and urbanism
Special rig pulls long concrete piles
Details of special equipment, including A-frame, 42 × 70-ft barge and pile pulling yoke, developed to remove 95 ft long concrete piles of partially completed mile-long structure in San Francisco Bay; pile pulling procedure described. (See also Construction Methods v 28 n 7 July 1946 p 92-3)
Special rig pulls long concrete piles
Details of special equipment, including A-frame, 42 × 70-ft barge and pile pulling yoke, developed to remove 95 ft long concrete piles of partially completed mile-long structure in San Francisco Bay; pile pulling procedure described. (See also Construction Methods v 28 n 7 July 1946 p 92-3)
Special rig pulls long concrete piles
Eng News-Rec
Engineering News-Record ; 137
1946
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special rig pulls long concrete piles
Engineering Index Backfile | 1946
Special rig pulls twisted sheetpiles
Engineering Index Backfile | 1944
Engineering Index Backfile | 1945
Precasting concrete piles with special armor belt
Engineering Index Backfile | 1935
|British Library Online Contents | 2014
|