A platform for research: civil engineering, architecture and urbanism
Special rig pulls twisted sheetpiles
Steel sheet piling, whose butt ends were severely split and twisted in driving, created difficult removal problem; part of piling in cofferdam at Chicago filtration plant was pulled with 50-ton-capacity floating derrick; piling, tightly embedded, required as much as 150-ton pull, provided by A-frame rigged on one end of barge.
Special rig pulls twisted sheetpiles
Steel sheet piling, whose butt ends were severely split and twisted in driving, created difficult removal problem; part of piling in cofferdam at Chicago filtration plant was pulled with 50-ton-capacity floating derrick; piling, tightly embedded, required as much as 150-ton pull, provided by A-frame rigged on one end of barge.
Special rig pulls twisted sheetpiles
Eng News-Rec
Engineering News-Record ; 133
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special rig pulls long concrete piles
Engineering Index Backfile | 1946
Special rig pulls long concrete piles
Engineering Index Backfile | 1946
British Library Online Contents | 2014
|Ciba pulls out of Hexcel alliance
British Library Online Contents | 2000