A platform for research: civil engineering, architecture and urbanism
Kingsley Dam gets new stone facing
Precast concrete riprap installed in 1941 on Kingsley Dam, near Ogallala, Neb, failed to prevent unforeseen disastrous wave wash scour on upstream face of hydraulic fill; all old riprap above lake level is being removed and replaced with 3-ft layer of quarried stone riprap.
Kingsley Dam gets new stone facing
Precast concrete riprap installed in 1941 on Kingsley Dam, near Ogallala, Neb, failed to prevent unforeseen disastrous wave wash scour on upstream face of hydraulic fill; all old riprap above lake level is being removed and replaced with 3-ft layer of quarried stone riprap.
Kingsley Dam gets new stone facing
Eng News -- Rec
Engineering News-Record ; 136
1946
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
Engineering Index Backfile | 1946
Address book - Mark Kingsley of Mark Kingsley Architects reveals his contacts
Online Contents | 2008
|KINGSLEY DAM FUNCTIONAL EXERCISE
British Library Conference Proceedings | 2016
|Kingsley Dam Functional Exercise
British Library Conference Proceedings | 1993
|