A platform for research: civil engineering, architecture and urbanism
Full-circle forms used for lining heavily reinforced pressure tunnels
Placing concrete by guns in continuous pours of 72 ft on distribution system of Colorado River aqueduct; method of bending steel; moving forms and handling concrete; concrete characteristics.
Full-circle forms used for lining heavily reinforced pressure tunnels
Placing concrete by guns in continuous pours of 72 ft on distribution system of Colorado River aqueduct; method of bending steel; moving forms and handling concrete; concrete characteristics.
Full-circle forms used for lining heavily reinforced pressure tunnels
West Construction News
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sprayed reinforced concrete in tunnels lining
Engineering Index Backfile | 1965
|Hydro-mechanical interaction analysis of reinforced concrete lining in pressure tunnels
British Library Online Contents | 2017
|Hydro-mechanical interaction analysis of reinforced concrete lining in pressure tunnels
British Library Online Contents | 2017
|Full circle tunnel lining placed in single pour
Engineering Index Backfile | 1936