A platform for research: civil engineering, architecture and urbanism
Belt conveyor jumbo aids in lining small tunnel
Use of jumbo 75 ft long receiving cars containing aggregate or concrete and delivering contents via conveyor belt to concrete mixer, or to concrete placing machine, in construction of Mono Craters tunnel by Bureau of Waters Works and Supply, City of Los Angeles.
Belt conveyor jumbo aids in lining small tunnel
Use of jumbo 75 ft long receiving cars containing aggregate or concrete and delivering contents via conveyor belt to concrete mixer, or to concrete placing machine, in construction of Mono Craters tunnel by Bureau of Waters Works and Supply, City of Los Angeles.
Belt conveyor jumbo aids in lining small tunnel
Eng News-Rec
Engineering News-Record ; 118
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Finite Element Analysis of Universal-Rod Steel-Shuttering Jumbo for Tunnel Lining
British Library Conference Proceedings | 2011
|Design and analysis of truss-beam steel-shuttering jumbo for tunnel lining based on CAD/CAE
British Library Online Contents | 2011
|Design and analysis of truss-beam steel-shuttering jumbo for tunnel lining based on CAD/CAE
British Library Online Contents | 2011
|Jumbo dredgers need jumbo hoses
Online Contents | 1997