A platform for research: civil engineering, architecture and urbanism
Large steel penstock placed in tunnel at Fort Peck
Design and erection of steel pipe, 24 ft 8 in. in diam, inside of outlet half of Tunnel No. 1 on Fort Peck project; fabrication and assembly; concrete placement; construction of drains; painting. (see also French translation in Genie Civil v 111 n 2876 Sept 25 1937 p 274-5)
Large steel penstock placed in tunnel at Fort Peck
Design and erection of steel pipe, 24 ft 8 in. in diam, inside of outlet half of Tunnel No. 1 on Fort Peck project; fabrication and assembly; concrete placement; construction of drains; painting. (see also French translation in Genie Civil v 111 n 2876 Sept 25 1937 p 274-5)
Large steel penstock placed in tunnel at Fort Peck
Eng News-Rec
Pence, A.W. (author)
Engineering News-Record ; 118
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Large steel penstock placed in tunnel at Fort Peck
Engineering Index Backfile | 1937
|Enamel melted electricaly for penstock of Fort Peck dam
Engineering Index Backfile | 1938
|Fort Peck Project - Power Plant No. 1 Penstock Replacement
British Library Conference Proceedings | 1993
|Diversion-tunnel driving at fort peck dam
Engineering Index Backfile | 1935
ASCE | 2021
|