A platform for research: civil engineering, architecture and urbanism
Diversion-tunnel driving at fort peck dam
Construction of four parallel circular concrete-lined tunnels, having lined diameter of 26 ft and averaging 6317 ft in length; rock conditions; pilot tunneling methods; conveyor spoil disposal; concreting plant and methods.
Diversion-tunnel driving at fort peck dam
Construction of four parallel circular concrete-lined tunnels, having lined diameter of 26 ft and averaging 6317 ft in length; rock conditions; pilot tunneling methods; conveyor spoil disposal; concreting plant and methods.
Diversion-tunnel driving at fort peck dam
Eng News-Rec
Engineering News-Record ; 114
1935
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fort Peck diversion tunnels redesigned for faster driving
Engineering Index Backfile | 1936
ASCE | 2021
|Engineering Index Backfile | 1942
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1940
|