A platform for research: civil engineering, architecture and urbanism
Experience of U S Engineer District at South Jetty of Columbia River with use of asphalt mastic as binder, on stretch of some 300 ft, to prevent disintegration due to heavy seas; asphalt plant; preparing asphalt mastic; dumping mastic; penetration; quantities and costs; effect of winter storms. (See also Military Engr v 29 n 164 Mar-Apr 1937 p 135-8)
Experience of U S Engineer District at South Jetty of Columbia River with use of asphalt mastic as binder, on stretch of some 300 ft, to prevent disintegration due to heavy seas; asphalt plant; preparing asphalt mastic; dumping mastic; penetration; quantities and costs; effect of winter storms. (See also Military Engr v 29 n 164 Mar-Apr 1937 p 135-8)
Columbia River South Jetty terminal
Contractors Engrs Monthly
Hickson, R.E. (author)
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Columbia River South Jetty terminal
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1891
Rebuilding long jetty for Columbia River
Engineering Index Backfile | 1935
Asphalt used in experiment to consolidate Columbia River jetty
Engineering Index Backfile | 1937
|Jetty maintenance at mouth of Columbia
Engineering Index Backfile | 1933
|