A platform for research: civil engineering, architecture and urbanism
Repair of old rock jetty; constructing approach tram-way; placing new rock; specifications for stone; equipment and methods; cost of work $1,286,600.
Repair of old rock jetty; constructing approach tram-way; placing new rock; specifications for stone; equipment and methods; cost of work $1,286,600.
Jetty maintenance at mouth of Columbia
Military Engr
Hickson, R.E. (author)
Military Engineer ; 25
1933
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1891
Columbia River South Jetty terminal
Engineering Index Backfile | 1937
|Rebuilding long jetty for Columbia River
Engineering Index Backfile | 1935
Columbia River South Jetty terminal
Engineering Index Backfile | 1937
|Effectiveness of Jetty Construction at the Shiribetsu River Mouth, Japan
British Library Conference Proceedings | 2004
|