A platform for research: civil engineering, architecture and urbanism
Description of spraying of 350 yd of haulage road, where high velocity of ventilating air created dust clouds; method of mixing; treatment with water only gave results of limited permanence; calcium chloride gave satisfactory results, apparently equal to calcium chloride and perminal. Before Manchester Geological and Min Soc. (See also Instn Min Engrs -- Trans v 93 Part 3 June 1937 p 252-60; (discussion) 271-80; Iron and Coal Trades Rev v 134 n 3602 Mar 12 1937 p 485 and (discussion) n 3605 Apr 2 p 606)
Description of spraying of 350 yd of haulage road, where high velocity of ventilating air created dust clouds; method of mixing; treatment with water only gave results of limited permanence; calcium chloride gave satisfactory results, apparently equal to calcium chloride and perminal. Before Manchester Geological and Min Soc. (See also Instn Min Engrs -- Trans v 93 Part 3 June 1937 p 252-60; (discussion) 271-80; Iron and Coal Trades Rev v 134 n 3602 Mar 12 1937 p 485 and (discussion) n 3605 Apr 2 p 606)
"Perminal W" and calcium-chloride treatment of haulage-roads
Colliery Guardian
Price, H. (author)
Colliery Guardian ; 154
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stabilization of strip mine haulage roads
Engineering Index Backfile | 1959
|Design of surface mine haulage roads : a manual
TIBKAT | 1977
|How can you prevent dust on haulage roads?
Engineering Index Backfile | 1954
An overview of the structural design of mine haulage roads
Tema Archive | 1996
|Stabilizing Unpaved Roads with Calcium Chloride
British Library Online Contents | 2002
|