A platform for research: civil engineering, architecture and urbanism
Reconstruction of Chelsea bridge, London
New bridge across River Thames takes place of suspension structure in service since 1858; oa length 698 ft, oa width 83 ft; it carried 40 ft carriageway and two footways; though bridge is of suspension type, cables, instead of being secured to usual anchorages at each end, are fastened to ends of stiffening girders, which support deck. (see also Engineer v 163 n 4243 May 7 1937 p 541-4)
Reconstruction of Chelsea bridge, London
New bridge across River Thames takes place of suspension structure in service since 1858; oa length 698 ft, oa width 83 ft; it carried 40 ft carriageway and two footways; though bridge is of suspension type, cables, instead of being secured to usual anchorages at each end, are fastened to ends of stiffening girders, which support deck. (see also Engineer v 163 n 4243 May 7 1937 p 541-4)
Reconstruction of Chelsea bridge, London
Engineering
Engineering ; 143
1937
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Chelsea bridge, London
Engineering Index Backfile | 1937
Reconstruction of Chelsea bridge
Engineering Index Backfile | 1938
|Reconstruction of Chelsea bridge
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1936
Chelsea Street Bridge Replacement
British Library Conference Proceedings | 1998
|