A platform for research: civil engineering, architecture and urbanism
Features of floodlighting installation at Kezar Stadium, San Francisco; chemical solidification of foundation soil, to permit excavation of pier footings without shoring, was used for six 136-ft high floodlight towers. (See also Elec Construction and Maintenance v 49 n 4 Apr 1950 p 58-9, 165)
Features of floodlighting installation at Kezar Stadium, San Francisco; chemical solidification of foundation soil, to permit excavation of pier footings without shoring, was used for six 136-ft high floodlight towers. (See also Elec Construction and Maintenance v 49 n 4 Apr 1950 p 58-9, 165)
New tower installation technique
Elec West
Bristow, T.G. (author)
Electrical West ; 104
1950
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New tower installation technique
Engineering Index Backfile | 1950
|TOWER ERECTION SYSTEM AND TOWER ERECTION INSTALLATION METHOD
European Patent Office | 2022
|