A platform for research: civil engineering, architecture and urbanism
Diversion is big job at canyon ferry dam
Concrete dam, on Missouri river, 212 ft high will control flows that sometimes exceed 30,000 cfs, supply irrigation water to 310,000 acres, permit production of 50,000 kw by three units and regulate discharge for six downstream plants; river diversion was achieved by building 65 ft wide rectangular flume extending 1000 ft along river; illustrated data on flume construction and discharge control; concrete for dam will be placed from cableway.
Diversion is big job at canyon ferry dam
Concrete dam, on Missouri river, 212 ft high will control flows that sometimes exceed 30,000 cfs, supply irrigation water to 310,000 acres, permit production of 50,000 kw by three units and regulate discharge for six downstream plants; river diversion was achieved by building 65 ft wide rectangular flume extending 1000 ft along river; illustrated data on flume construction and discharge control; concrete for dam will be placed from cableway.
Diversion is big job at canyon ferry dam
Eng News-Rec
Price, Jr., W.P. (author)
Engineering News-Record ; 145
1950
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1898
|Engineering Index Backfile | 1957
Diversion tunnel at box canyon
Engineering Index Backfile | 1953
|$11,000,000 dredging job, at Canyon Ferry Dam
Engineering Index Backfile | 1950
|Glen Canyon Dam Diversion Tunnel Outlets
ASCE | 2021
|