A platform for research: civil engineering, architecture and urbanism
Cableways for dam construction at Saint-BartheLemy, Valais, Switzerland
Concrete gravity dam, 85 m high, containing 300,000 cu m concrete, located at 2200 m altitude; problem of material transport solved by two cableways, one 1900 m long, capacity 192 tons per hr; other 11,300 m long, capacity 30 tons per hr; concrete placed by means of cableway, 502 m long.
Cableways for dam construction at Saint-BartheLemy, Valais, Switzerland
Concrete gravity dam, 85 m high, containing 300,000 cu m concrete, located at 2200 m altitude; problem of material transport solved by two cableways, one 1900 m long, capacity 192 tons per hr; other 11,300 m long, capacity 30 tons per hr; concrete placed by means of cableway, 502 m long.
Cableways for dam construction at Saint-BartheLemy, Valais, Switzerland
Les transporteur funiculaires utilises pour la construction du barrage de Saint-Barthelemy (Valais. Suisse)
Cirilli, B. (author)
Genie Civil ; 126
1949
4 pages
Illustrations
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Norris Dam Construction Cableways
ASCE | 2021
|WALTER HUNZIKER ARCHITECTS: Two cableways in Switzerland
Online Contents | 2002
|ASCE | 2021
|Cableways for Dam construction
Engineering Index Backfile | 1958
|Norris dam construction cableways
Engineering Index Backfile | 1939
|