A platform for research: civil engineering, architecture and urbanism
Erection of railroad bridge over Mosel river in Guels, Germany, in 1876, 1927 and 1948
Comparison of methods employed; particular consideration of work required for reconstruction after war; new bridge consists of three steel arch spans 63 m each and 2 masonry vaults, 17.5 m span each.
Erection of railroad bridge over Mosel river in Guels, Germany, in 1876, 1927 and 1948
Comparison of methods employed; particular consideration of work required for reconstruction after war; new bridge consists of three steel arch spans 63 m each and 2 masonry vaults, 17.5 m span each.
Erection of railroad bridge over Mosel river in Guels, Germany, in 1876, 1927 and 1948
Montagevorgaenge beim bau der Moselbruecke in Guels in den Jahren 1876, 1927 and 1948
Bautechnik ; 27
1950
5 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of double track railroad bridge over Mosel River, near Eller, Germany
Engineering Index Backfile | 1957
|Strengthening the railroad bridge over the mosel at Guls
Engineering Index Backfile | 1927
|Treis Bridge over the Mosel River
Engineering Index Backfile | 1930
|Adolph Hitler bridge over Mosel River at Koblenz
Engineering Index Backfile | 1934
|Adolph Hitler bridge over Mosel River at Koblenz
Engineering Index Backfile | 1934
|