A platform for research: civil engineering, architecture and urbanism
Model and prototype studies on unique spillway
To determine operating characteristics of main spillway that was tunneled through rock abutment, extensive model tests were made prior to completion of design; report on model tests and comparison of them with prototype performance during year that has elapsed since structure was finished.
Model and prototype studies on unique spillway
To determine operating characteristics of main spillway that was tunneled through rock abutment, extensive model tests were made prior to completion of design; report on model tests and comparison of them with prototype performance during year that has elapsed since structure was finished.
Model and prototype studies on unique spillway
Civ Eng (NY)
Peterka, A.J. (author)
1946
3 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Spillway tests confirm model-prototype conformance
UB Braunschweig | 1954
|Spillway tests confirm model-prototype conformance
Engineering Index Backfile | 1954
Prototype Spillway Performance Verification
ASCE | 2021
|Conformity between model and prototype tests -- Madden dam spillway
Engineering Index Backfile | 1941
|