A platform for research: civil engineering, architecture and urbanism
21-in. sewer, laid in sand with ground-water level 5 ft above invert, had settled maximum distance of 3.25 ft and was badly cracked; reconstruction necessitated use of wellpoints for dewatering trench.
21-in. sewer, laid in sand with ground-water level 5 ft above invert, had settled maximum distance of 3.25 ft and was badly cracked; reconstruction necessitated use of wellpoints for dewatering trench.
Repairing sewer laid in quicksand
Pub Works
Coulter, R.G. (author)
Public Works ; 76
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
ASCE | 2021
|Engineering Index Backfile | 1938
|Engineering Index Backfile | 1881
|How 36 double prime sewer mains were placed through quicksand and mud boils
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1938
|