A platform for research: civil engineering, architecture and urbanism
Failure and reconstruction of Asan River Bridge in mile 40-41 in Dehra Dun district
Multiarched brick masonry bridge with 10 spans of 50 ft each, destroyed by heavy flood in 1947 was replaced by 80-in. deep T-beams of reinforced concrete of 50 and 75 ft span; piers built of brick are founded on wells.
Failure and reconstruction of Asan River Bridge in mile 40-41 in Dehra Dun district
Multiarched brick masonry bridge with 10 spans of 50 ft each, destroyed by heavy flood in 1947 was replaced by 80-in. deep T-beams of reinforced concrete of 50 and 75 ft span; piers built of brick are founded on wells.
Failure and reconstruction of Asan River Bridge in mile 40-41 in Dehra Dun district
Indian Concrete J
Verma, S.H.G. (author)
1951
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1945
Online Contents | 1949
|5-mile James river bridge built in 13 months
Engineering Index Backfile | 1929