A platform for research: civil engineering, architecture and urbanism
Battle at Asan point
Seabee battalion constructed 8 mi 4-lane highway through hill containing 200,000 cu yds of excavation on Pacific Island; difficulties encountered and work accomplished are described.
Battle at Asan point
Seabee battalion constructed 8 mi 4-lane highway through hill containing 200,000 cu yds of excavation on Pacific Island; difficulties encountered and work accomplished are described.
Battle at Asan point
Excavating Engr
Excavating Engineer ; 39
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Structural Schematic Design of a Tall Building in Asan using the Diagrid System
British Library Conference Proceedings | 2008
|Failure and reconstruction of Asan River Bridge in mile 40-41 in Dehra Dun district
Engineering Index Backfile | 1951
|Distribution of phthalate esters in air, water, sediments, and fish in the Asan Lake of Korea
DOAJ | 2019
|British Library Online Contents | 2012
|