A platform for research: civil engineering, architecture and urbanism
Report on construction of subgrade for cut-off on Idaho State highway 25, from Boise to Salt Lake City; involved in project are relocation of irigation canals, construction of reinforced concrete bridge 120 ft long, placement of culvert pipe, and grading and compacting of roadbed; data on excavation, operation of "caterpillar" scraper, grader, shovel and end-dump trucks.
Report on construction of subgrade for cut-off on Idaho State highway 25, from Boise to Salt Lake City; involved in project are relocation of irigation canals, construction of reinforced concrete bridge 120 ft long, placement of culvert pipe, and grading and compacting of roadbed; data on excavation, operation of "caterpillar" scraper, grader, shovel and end-dump trucks.
Idaho's largest highway job is first test for Morrison-Knudsen's new highway division
Pac Bldr Engr
Laing, R. (author)
1946
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Lot of dirt dumped in Idaho's largest highway fill
Engineering Index Backfile | 1953
Moscow largest highway tunnel construction project
Online Contents | 2004
Moscow largest highway tunnel construction project
British Library Conference Proceedings | 2004
|Moscow largest highway tunnel construction project
Elsevier | 2004