A platform for research: civil engineering, architecture and urbanism
Building floors poured from top in forms dropped floor by floor
Illustrated description of new method of building concrete floors from top floor downward; form panels are hung by rods on cured slab two floors above floor under construction.
Building floors poured from top in forms dropped floor by floor
Illustrated description of new method of building concrete floors from top floor downward; form panels are hung by rods on cured slab two floors above floor under construction.
Building floors poured from top in forms dropped floor by floor
Construction Methods
Hediger, E. (author)
Construction Methods ; 29
1947
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Slabs & Floors - Floor innovations
Online Contents | 2007
Drydock floor being poured 60 ft below Puget Sound
Engineering Index Backfile | 1960
|Post-poured floor construction method for column root part
European Patent Office | 2024
|