A platform for research: civil engineering, architecture and urbanism
How elevated highway piling was set in tight quarters
Difficulty of access due to working area situated in central reservation of existing dual roadway caused special site problems at Chiswick-Langley, England's first major elevated road; provision of piling for concrete columns supporting road, and construction of 2 up and down ramps are described.
How elevated highway piling was set in tight quarters
Difficulty of access due to working area situated in central reservation of existing dual roadway caused special site problems at Chiswick-Langley, England's first major elevated road; provision of piling for concrete columns supporting road, and construction of 2 up and down ramps are described.
How elevated highway piling was set in tight quarters
World Construction
Mead, H.T. (author)
World Construction ; 16
1963
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Constructing four-lane highway in tight quarters
Engineering Index Backfile | 1961
|British Library Online Contents | 1999
ASCE | 2022
|Highway protection with steel sheet piling
Engineering Index Backfile | 1936
|