A platform for research: civil engineering, architecture and urbanism
Constructing four-lane highway in tight quarters
Details of construction of 1.4 mi section of Interstate Route 29 through Sioux City in area bounded by Missouri River and adjacent stockyards; dredging operations, construction of revetment, sewers, bridges and culverts; placing of 800,000 cu yd of hydraulic sand fill.
Constructing four-lane highway in tight quarters
Details of construction of 1.4 mi section of Interstate Route 29 through Sioux City in area bounded by Missouri River and adjacent stockyards; dredging operations, construction of revetment, sewers, bridges and culverts; placing of 800,000 cu yd of hydraulic sand fill.
Constructing four-lane highway in tight quarters
Better Roads
Skaff, D.J. (author)
Better Roads ; 31
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
How elevated highway piling was set in tight quarters
Engineering Index Backfile | 1963
|British Library Online Contents | 1999
ASCE | 2022
|Service Insertion Preferred In Tight Working Quarters
Online Contents | 1997
A Sideways Pipe Solution for Tight Quarters
Online Contents | 1996
|