A platform for research: civil engineering, architecture and urbanism
Round butte dam fish-handling costs 2.5% of total-project outlay
Low cost fish passage facilities at Portland General Electric Co's Round Butte Dam are discussed; facilities include trolley system for carrying upstream migrants over dam, and reverse lock minimizing head problems for downstream fingerlings.
Round butte dam fish-handling costs 2.5% of total-project outlay
Low cost fish passage facilities at Portland General Electric Co's Round Butte Dam are discussed; facilities include trolley system for carrying upstream migrants over dam, and reverse lock minimizing head problems for downstream fingerlings.
Round butte dam fish-handling costs 2.5% of total-project outlay
Elec World
Eicher, G.J. (author)
Electrical World ; 161
1964
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Some unusual aspects of Round Butte Project
Engineering Index Backfile | 1965
|British Library Online Contents | 2003
|Positive Results from Fish Collection System at Round Butte Dam
British Library Online Contents | 2012
|Pelton-Round Butte: Enhancing Fish Passage, Wildlife, and Recreational Opportunities
British Library Online Contents | 2004
|Solving rocky problems at Round Butte Dam
Engineering Index Backfile | 1962