A platform for research: civil engineering, architecture and urbanism
Computer control of operation of California Water Project is planned; existing South Bay Aqueduct has been instrumented and will be used as model to study control system for entire project; plan for computer operation of South Bay Aqueduct, and control and communication equipment as well as equipment and arrangement of control centers are described. (43828)
Computer control of operation of California Water Project is planned; existing South Bay Aqueduct has been instrumented and will be used as model to study control system for entire project; plan for computer operation of South Bay Aqueduct, and control and communication equipment as well as equipment and arrangement of control centers are described. (43828)
Computer controls for aqueduct operation
ASCE, J Pipeline Div
Golze, A.R. (author)
1968
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fabricated arched aqueduct support, aqueduct and construction method of aqueduct support
European Patent Office | 2024
|Aqueduct structure and aqueduct underwater cutting method
European Patent Office | 2024
|Tema Archive | 1997
|Engineering Index Backfile | 1926
|