A platform for research: civil engineering, architecture and urbanism
Slip-forming 450ft high chimney
Construction of new 450 ft high reinforced concrete chimney at Nottingham power station of Central Electricity Generating Board forms part of plan to reduce atmospheric pollution; chimney is 31 ft 2 in. lined ID immediately above 37 ft baffle, and 21 ft 11 in. in diam at top of nozzle; wall thickness of shell tapers from 20 in. at base to 6 1/2 in. at point 243 ft above top of pile cap, and is then constant; slip-forming procedure is described.
Slip-forming 450ft high chimney
Construction of new 450 ft high reinforced concrete chimney at Nottingham power station of Central Electricity Generating Board forms part of plan to reduce atmospheric pollution; chimney is 31 ft 2 in. lined ID immediately above 37 ft baffle, and 21 ft 11 in. in diam at top of nozzle; wall thickness of shell tapers from 20 in. at base to 6 1/2 in. at point 243 ft above top of pile cap, and is then constant; slip-forming procedure is described.
Chimney slip form construction platform and chimney slip form construction method
European Patent Office | 2021
|Ultra-high reducing chimney slip form construction method
European Patent Office | 2022
|Slip form lifting system for building cast-in-place concrete chimney
European Patent Office | 2023
|