A platform for research: civil engineering, architecture and urbanism
Plastic lining for Utah canal
Procedure for placing plastic lining of thin polyethylene sheet in 3 mi section of delivery canal in Utah is described; plastic in position with upper edges was buried in anchor trenches; 3 lengths of 20-ft plastic were required with 2 longitudinal joints; cover material for bottom of canal was placed by dragline; layer of gravel was placed over fine-textured fill along top of bank to prevent erosion.
Plastic lining for Utah canal
Procedure for placing plastic lining of thin polyethylene sheet in 3 mi section of delivery canal in Utah is described; plastic in position with upper edges was buried in anchor trenches; 3 lengths of 20-ft plastic were required with 2 longitudinal joints; cover material for bottom of canal was placed by dragline; layer of gravel was placed over fine-textured fill along top of bank to prevent erosion.
Plastic lining for Utah canal
Western Construction
Western Construction ; 39
1964
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Canal lining maintenance in Utah
Engineering Index Backfile | 1953
|UB Braunschweig | 1977
|TIBKAT | 1977
|Engineering Index Backfile | 1941