A platform for research: civil engineering, architecture and urbanism
Overhead cable spots bridge materials
Cableway slung from towers rising 400 ft above riverbed is spotting massive lifts of steel and concrete during construction of 5461-ft long Devils River bridge in Texas; cableway is controlled from air conditioned hoist room at one side of river; to place concrete, air operated concrete buckets equipped with quick-disconnect couplings are controlled by operator at point of discharge.
Overhead cable spots bridge materials
Cableway slung from towers rising 400 ft above riverbed is spotting massive lifts of steel and concrete during construction of 5461-ft long Devils River bridge in Texas; cableway is controlled from air conditioned hoist room at one side of river; to place concrete, air operated concrete buckets equipped with quick-disconnect couplings are controlled by operator at point of discharge.
Overhead cable spots bridge materials
Construction Methods Equipment
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.