A platform for research: civil engineering, architecture and urbanism
Builds penta-treated overhead bridge
New seven-span framed-bent structure treated with pentrachlorophenol and applied deck made of 1-Beam-Lok embedded in concrete, constructed, when Grand Trunk Western had to replace overhead highway bridge at Valparaiso, Ind; bracing not treated; service life of 30 to 40 yr expected.
Builds penta-treated overhead bridge
New seven-span framed-bent structure treated with pentrachlorophenol and applied deck made of 1-Beam-Lok embedded in concrete, constructed, when Grand Trunk Western had to replace overhead highway bridge at Valparaiso, Ind; bracing not treated; service life of 30 to 40 yr expected.
Builds penta-treated overhead bridge
Ry Eng Maintenance
1952
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
|Baltimore county builds covered bridge
Engineering Index Backfile | 1963
|Builds new Tennessee river bridge
Engineering Index Backfile | 1933
Vermont builds floating timber bridge
Engineering Index Backfile | 1940
Builds new bridge across Kanawha
Engineering Index Backfile | 1947
|