Over 7 million yards of rock excavated for two power projects
80% of Sweden's hydroelectric power plants are underground with capacity of 1,000,000 kw; they required moving of 10,000,000 cu yd of rock; largest are 285,000 kw Kilforsen plant and Stornorrfors project with four 130,000 kw electric units each; both projects will have 60 ft wide rock chambers; 170,000 hp Francis turbines installed; data on headrace tunnel, excavation of rock chamber and tailrace tunnel.
Over 7 million yards of rock excavated for two power projects
80% of Sweden's hydroelectric power plants are underground with capacity of 1,000,000 kw; they required moving of 10,000,000 cu yd of rock; largest are 285,000 kw Kilforsen plant and Stornorrfors project with four 130,000 kw electric units each; both projects will have 60 ft wide rock chambers; 170,000 hp Francis turbines installed; data on headrace tunnel, excavation of rock chamber and tailrace tunnel.
Over 7 million yards of rock excavated for two power projects
Eng News-Rec
Nilsson, T. (author)
Engineering News-Record ; 153
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Million yards concrete for dam
Engineering Index Backfile | 1943
80-wagon fleet moves million yards per month
Engineering Index Backfile | 1947
|Moving a million yards of earth a year
Engineering Index Backfile | 1929
Hungry horse dam tops million yards in short season
Engineering Index Backfile | 1951
|Scrapers move 6 million yards at Seattle-Tacoma airport
Engineering Index Backfile | 1943