A platform for research: civil engineering, architecture and urbanism
Hungry horse dam tops million yards in short season
Pictorial report on concreting dam at rate of more than 6000 cu yd per 24 hr; dam will require 2,900,000 cu yd of concrete; four cableways of 2415 ft span are employed for concrete and material handling system; other materials handling equipment.
Hungry horse dam tops million yards in short season
Pictorial report on concreting dam at rate of more than 6000 cu yd per 24 hr; dam will require 2,900,000 cu yd of concrete; four cableways of 2415 ft span are employed for concrete and material handling system; other materials handling equipment.
Hungry horse dam tops million yards in short season
Construction Methods Equipment
Richardson, H.W. (author)
1951
6 pages
Illustrations
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1949
|Concreting methods at Hungry Horse
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1955