A platform for research: civil engineering, architecture and urbanism
Light-weight building construction
New technical high school built at West Worthing is first to be built using "Intergrid" system; designed jointly by Pre-Stressed Concrete Co and Architects and Building Branch, Ministry of Education; technique designed initially for buildings up to 4 stories in height; it consists of light prestressed concrete frame combined with standard structural units cast in factory.
Light-weight building construction
New technical high school built at West Worthing is first to be built using "Intergrid" system; designed jointly by Pre-Stressed Concrete Co and Architects and Building Branch, Ministry of Education; technique designed initially for buildings up to 4 stories in height; it consists of light prestressed concrete frame combined with standard structural units cast in factory.
Light-weight building construction
Engineering
Engineering ; 180
1955
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Thermal investigations of light weight building construction
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1941
|Set building and building construction method with composite light weight panel for structure
European Patent Office | 2016
|European Patent Office | 2020
|Heat and humidity requirements in heavy and light weight building construction
Engineering Index Backfile | 1953
|