A platform for research: civil engineering, architecture and urbanism
New concrete bridge over Moselle River at Coblenz
Past and Present Traffic Problems on Moselle Bridge, E.BITZEGEIO, p 273-7; Design and Calculation of Bridge, U.FINSTERWALDER, G.KNITTEL, p 278-94; Construction, K.GRIES, H.SCHWARZER, p 295-304; Architectural Design, G.LOHMER, p 305-7; Heat Stresses of Main Girders Due to Hydration of Cement, A.MEHMEL, p 308-10.
New concrete bridge over Moselle River at Coblenz
Past and Present Traffic Problems on Moselle Bridge, E.BITZEGEIO, p 273-7; Design and Calculation of Bridge, U.FINSTERWALDER, G.KNITTEL, p 278-94; Construction, K.GRIES, H.SCHWARZER, p 295-304; Architectural Design, G.LOHMER, p 305-7; Heat Stresses of Main Girders Due to Hydration of Cement, A.MEHMEL, p 308-10.
New concrete bridge over Moselle River at Coblenz
Die Neue Moselbruecke
Bauingenieur ; 29
1954
38 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of the railroad bridge over the Moselle River near coblenz
Engineering Index Backfile | 1921
|Highway bridge over the Moselle river between Cochem and Cond
Engineering Index Backfile | 1928
A new reinforced-concrete bridge on the Moselle
Engineering Index Backfile | 1910
Second and third contest for Mosel River bridge at Coblenz
Engineering Index Backfile | 1932
|Improvement works on Moselle (river)
Engineering Index Backfile | 1960
|