A platform for research: civil engineering, architecture and urbanism
Construction details of new bridge built in 1917-18 to replace 60-year-old bridge. For construction of new spans old superstructures were used for falsework. Tables are given showing results of bending and tensile tests of metal taken from old bridge.
Construction details of new bridge built in 1917-18 to replace 60-year-old bridge. For construction of new spans old superstructures were used for falsework. Tables are given showing results of bending and tensile tests of metal taken from old bridge.
Reconstruction of the railroad bridge over the Moselle River near coblenz
Einiges uber den Umbau der Eisenbahnbrucke uber die Mosel bei Koblenz
Bohny, F. (author)
Eisenbau ; 12
1921
5 pages
9 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
New concrete bridge over Moselle River at Coblenz
Engineering Index Backfile | 1954
Reconstruction of railroad bridge over Rhone River
Engineering Index Backfile | 1951
|Highway bridge over the Moselle river between Cochem and Cond
Engineering Index Backfile | 1928
Reconstruction of railroad bridge over Rhone river
Engineering Index Backfile | 1951
|Reconstruction of double track railroad bridge over Mosel River, near Eller, Germany
Engineering Index Backfile | 1957
|