A platform for research: civil engineering, architecture and urbanism
Idaho improves bridge system
Bridges 1310 and 960 ft, respectively, near Burley and Rupert, are concrete trestle structures with steel shell piles, concrete caps, precast concrete stringers and poured in place decks; concrete placed in piles and in cap forms from falsework gangways; crane used to handle 10-ton concrete stringers in yard.
Idaho improves bridge system
Bridges 1310 and 960 ft, respectively, near Burley and Rupert, are concrete trestle structures with steel shell piles, concrete caps, precast concrete stringers and poured in place decks; concrete placed in piles and in cap forms from falsework gangways; crane used to handle 10-ton concrete stringers in yard.
Idaho improves bridge system
Pac Bldr Engr
1954
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Innovative Bridge Repairs in Idaho
British Library Conference Proceedings | 1997
|Snake River lift bridge links Washington-Idaho
Engineering Index Backfile | 1939
|Mules and airplane carry material for Idaho bridge
Engineering Index Backfile | 1939
|Ultrasonic NDT of bridge steel and weathering steel bridge investigation in Idaho
Tema Archive | 1998
|