Design and construction of certain temporary works -- Upper Silent Valley Reservoir, Co. Down
Contractors temporary construction equipment and construction under his control; large structural steel derrick gantry of 400 ft span; timber and steelwork set of aggregate weigh batching bins of 900 ton capacity; reinforced concrete screening and aggregate storage bin, using precast concrete, of 1800 ton capacity; relative positions of these three structures are shown in general site layout.
Design and construction of certain temporary works -- Upper Silent Valley Reservoir, Co. Down
Contractors temporary construction equipment and construction under his control; large structural steel derrick gantry of 400 ft span; timber and steelwork set of aggregate weigh batching bins of 900 ton capacity; reinforced concrete screening and aggregate storage bin, using precast concrete, of 1800 ton capacity; relative positions of these three structures are shown in general site layout.
Design and construction of certain temporary works -- Upper Silent Valley Reservoir, Co. Down
Structural Engr
Shirley, W.J. (author)
Structural Engineer ; 35
1957
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Silent valley reservoir. Mourne Mountains, county of Down
Engineering Index Backfile | 1934
Engineering Index Backfile | 1931
Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1934
|Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1934
|Construction of silent valley reservoir. Belfast water-supply
Engineering Index Backfile | 1935
|