A platform for research: civil engineering, architecture and urbanism
Lining of Bitterbush Flood Control Channel in California with concrete; project was 3641 ft long; upper section in trapezoidal channel 2127 ft in length, designed to carry 1050 cfs on slope of .002 ft per ft; lower section is 1331 ft long and is designed to carry 1100 cfs on .001 slope; rotary type tiller mounted on special rig powered by Ferguson tractor used for fine grading work.
Lining of Bitterbush Flood Control Channel in California with concrete; project was 3641 ft long; upper section in trapezoidal channel 2127 ft in length, designed to carry 1050 cfs on slope of .002 ft per ft; lower section is 1331 ft long and is designed to carry 1100 cfs on .001 slope; rotary type tiller mounted on special rig powered by Ferguson tractor used for fine grading work.
Special rigs speed channel lining
Western Construction
Osborne, H.G. (author)
Western Construction ; 32
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Special rigs speed up drilling and mucking on tunnel job
Engineering Index Backfile | 1965
Special rigs simplify highway widening
Engineering Index Backfile | 1947
Engineering Index Backfile | 1963
FINLAND REPORT - Special purpose piling rigs
Online Contents | 2000
Special rigs build Friant-Kern canal
Engineering Index Backfile | 1947