A platform for research: civil engineering, architecture and urbanism
New section of bridge departs from usual practice; one feature of design of Saticoy bridge, Calif, is that of continuity, where multiples of three and four spans are tied together solidly over piers; this condition was provided for in construction of T-girders where section of deck slab or flange was omitted in precast operation; pier forms reused 22 times. (See also Calif Highways and Pub Works v 35 n 7-8 July-Aug 1957 p 26-9, 72)
New section of bridge departs from usual practice; one feature of design of Saticoy bridge, Calif, is that of continuity, where multiples of three and four spans are tied together solidly over piers; this condition was provided for in construction of T-girders where section of deck slab or flange was omitted in precast operation; pier forms reused 22 times. (See also Calif Highways and Pub Works v 35 n 7-8 July-Aug 1957 p 26-9, 72)
Prestressed bridge
Western Construction
McIntyre, W.A. (author)
Western Construction ; 32
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1951
|Engineering Index Backfile | 1957
|Engineering Index Backfile | 1968
British Library Conference Proceedings | 2003
|Engineering Index Backfile | 1956
|