A platform for research: civil engineering, architecture and urbanism
Massive concrete bomber slabs at hill air force base
Parking stands and runway approaches at Utah jet field are 11 in. to 14 in. thick; aprons are divided into 25 ft strips and poured in alternating lanes; 150-ton Los Angeles batching plant, equipped with Acton graph recorder, loads fleet of Mack and GMC trucks; mixed concrete has been pouring at rate of 1 1/3 yd batch per min; 630 to 650 cu yd being put through paver each day.
Massive concrete bomber slabs at hill air force base
Parking stands and runway approaches at Utah jet field are 11 in. to 14 in. thick; aprons are divided into 25 ft strips and poured in alternating lanes; 150-ton Los Angeles batching plant, equipped with Acton graph recorder, loads fleet of Mack and GMC trucks; mixed concrete has been pouring at rate of 1 1/3 yd batch per min; 630 to 650 cu yd being put through paver each day.
Massive concrete bomber slabs at hill air force base
Pac Bldr Engr
1956
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
|Winter construction methods followed at bomber base
Engineering Index Backfile | 1943
Massive slabs for southwestern airfield
Engineering Index Backfile | 1945
Ultra-thin concrete slabs with perforated metal base
TIBKAT | 2020
|Engineering Index Backfile | 1955
|