A platform for research: civil engineering, architecture and urbanism
Sand made excellent runway foundation for new airfield built at Plattsburg Air Force Base, NY; special foundation problem for heavy embankment involving clay underlain by silt, required sand drain type settlement procedures; $60 million base construction project designed to house 2-wing SAC operation; unusual construction problems and methods.
Sand made excellent runway foundation for new airfield built at Plattsburg Air Force Base, NY; special foundation problem for heavy embankment involving clay underlain by silt, required sand drain type settlement procedures; $60 million base construction project designed to house 2-wing SAC operation; unusual construction problems and methods.
Bomber base in sea of sand
Roads Streets
McKeever, H.J. (author)
Roads and Streets ; 98
1955
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Winter construction methods followed at bomber base
Engineering Index Backfile | 1943
Massive concrete bomber slabs at hill air force base
Engineering Index Backfile | 1956
"Blackout" bomber plants in south
Engineering Index Backfile | 1941
More power for bomber production
Engineering Index Backfile | 1942
Competitions & wins Lincoln Bomber Command memorial
British Library Online Contents | 2013